eco2lot smartcalc · Combine meters, calculate gaps, check the hierarchy

Sum counter

Every machine has its meter. But the question in the meeting is: what does the line, the hall, the site consume — and what the area with no meter? The sum counter answers both from the existing meters and shows along the way whether the metering points fit together.

What is a sum counter?

In eco2lot, a sum counter combines several existing feed or volume counters into one shared total value. Machine 1 with 120 kWh, machine 2 with 180 kWh and machine 3 with 200 kWh yield 500 kWh for the line. This creates levels: machines to the production line, lines to the hall, halls to the site, sites to the company. The sum counter sums volumes just as well — water of several areas, gas of several plants, production volumes of several machines. The sum arises per time unit: at the 15-minute cycle common in the energy market, or finer down to 1 minute — so the load peak of the line stays visible as well. The sum counter can subtract meters too: main meter minus all measured sub-meters yields the area for which no meter of its own exists. And because eco2lot evaluates several hierarchies of the metering structure in parallel, sums can be checked against each other for plausibility — a metering point that runs out of line catches the eye.

How it works

The calculation scheme

Calculation scheme sum counter Machine 1 120 kilowatt-hours plus machine 2 180 kilowatt-hours plus machine 3 200 kilowatt-hours yields 500 kilowatt-hours for the line. 120 kWh Machine 1 + 180 kWh Machine 2 + 200 kWh Machine 3 = 500 kWh Line total
Three machines, three feed counters: 120 + 180 + 200 kWh yield 500 kWh for the line. The sum counter calculates this per time unit — and becomes the input of the next level itself. With minus instead of plus the unmetered remainder arises: main meter 560 kWh − 500 kWh = 60 kWh for lighting and infrastructure.
In detail

What is inside the sum counter

What the sum counter is

  • The sum of several feed or volume counters — or their difference
  • One level above the single meters: line, hall, site, company
  • A calculated meter for areas with no measurement of their own
  • For energy as well as for volumes

Your benefitOrganizational levels and gaps arise from meters, with no additional measuring equipment.

Which data it uses

  • Two or more existing counters (feed, volume, sums as well)
  • The time series of these counters in the same unit
  • Optionally further sum counters as input for the next level

Your benefitYou rebuild the structure of your operation level by level.

What eco2lot calculates

  • The total value per time unit — at the 15-minute cycle or finer down to 1 minute
  • From this the sum per hour, shift, day, week, month and year
  • Machines → line → hall → site → company
  • Unmetered remainder: higher-level meter minus all meters of the same level
  • Plausibility: sum of the sub-meters against the main meter, across several hierarchies of the metering structure
  • Sum, minimum, maximum and average per evaluation, comparison across periods

Your benefitFrom the machine to the company the same number, calculated consistently — and checked.

What benefit arises

  • Consumption per line, hall or site with no main meter
  • Consumption of areas with no meter — lighting, infrastructure, auxiliary consumers
  • Detect faulty metering points before they distort KPIs and reports
  • KPIs on every level, basis for Sankey diagrams and energy flows

Your benefitThe sum shows where the lever is — the single meter why — and the reconciliation whether the measurement is right.

One level deeper

Usage patterns

The same sum counter solves three tasks — depending on whether you add, subtract or compare.

Build levels (add)

Machine 1 + 2 + 3 = line, line A + B = hall, hall 1 + 2 = site. Every level is a counter of its own with curve, KPIs and alarms — calculated per time unit, down to 1 minute.

Calculate gaps (subtract)

There is no meter for the lighting? Main meter of the hall minus all measured machine meters of the same level yields the unmetered remainder — a calculated meter for the area with no measurement.

Check the hierarchy (compare)

eco2lot evaluates several hierarchies of the metering structure in parallel: the sum of the sub-meters has to fit the higher-level meter. If the difference suddenly runs away, a metering point has failed, is wrongly scaled or a consumer has been added unnoticed.

Your outcome

Afterwards you can …

  • You see the consumption per line, hall and site — from the existing single meters.

  • Areas with no meter of their own get a calculated value: main meter minus measured sub-meters.

  • The metering point hierarchy checks itself: a metering point that runs out of line catches the eye immediately.

Frequently asked questions

What you should know about the sum counter

What does a sum counter do?

It combines several feed or volume counters into one total value — per evaluation period. This way machines become a line, lines a hall, halls a site.

Can a sum counter contain other sum counters?

Yes. Hall sums become the site sum, site sums the company sum. This way you rebuild the levels of your operation level by level.

Does the sum counter replace a main meter?

It delivers the total value from the single meters. An existing main meter makes it even more valuable: as a sum counter with minus, main meter minus measured sub-meters yields the unmetered remainder — lighting or infrastructure, for example — and the reconciliation of both shows whether all metering points work plausibly.

How do I calculate an area with no meter of its own?

With a sum counter that subtracts: choose the higher-level meter and subtract all meters of the same level. The result is a calculated meter for the area with no measurement — with curve, KPIs and alarms like any other.

How does eco2lot detect a faulty metering point?

Via the metering structure: eco2lot evaluates several hierarchies in parallel and sets the sum of the sub-meters against the higher-level meter. If the difference suddenly deviates, a metering point has failed, is wrongly scaled or a consumer has been added unnoticed — an alarm on the remainder counter reports it.

Does this work for volumes as well?

Yes. The sum counter likewise sums the water consumption of several areas, the gas consumption of several plants or the production volume of several machines.

At which cycle is the sum calculated?

Per time unit. The 15-minute cycle of the energy industry is the market standard; eco2lot calculates down to 1 minute on request. This way the sum of a line also shows short load peaks that would vanish in a 15-minute average.

Can I place an alarm on the sum?

Yes — on every level and on the remainder counter. An alarm reports when the hall exceeds its load limit, the unmetered remainder rises abruptly or the difference between main meter and sub-meters leaves the plausibility range.

Is the sum counter the right fit for your task?

Describe your starting point and your goal — we get back to you with a concrete recommendation of matching features and solutions, plus a price indication.

Configure your solution