Platform · eco2lot

eco2lot — the energy management platform for machines and processes

The platform that unifies energy, machine, and process data in one real-time view — vendor-independent, audit-proof, with a POC after 4–8 weeks.

  • 20 % energy saved — with your existing machines
  • 30 % more productivity — through real-time control
  • 4–8 wks POC ready to run — fixed price €10–20k
1 Measure eco2iot
2 Optimize eco2lot
3 Automate AI control

In use across: food manufacturing · metal processing · packaging · municipal utilities · multi-site retail chains

The eco2lot cockpit live: real-time load profile, KPI tiles, and active control strategies — one interface, one platform.

15+
years of industrial experience
500+
interfaces integrated
TOP 100
Innovator 2026
ISO 50001
audit-ready
The real problem

Your production creates plenty of data.
Efficient control becomes possible once all relevant information comes together in one shared place.

Energy, production, shift log — your data sources are all there. Each one precise on its own. Together, a still life of tabs and reports that nobody brings together for a decision.

Connection creates insight. Insight creates control. This is exactly where eco2lot comes in: as the single point where your plant data meets — and measurements turn into decisions.

What is eco2lot

A tidy workplace.
Structured data in one place.

Energy, machines, processes, knowledge, environment, automation — six worlds, one plant. Today they sit on six separate piles. eco2lot puts them on one table.

eco2lot is a vendor-independent energy management platform for manufacturing plants and facility portfolios. It connects existing meters, plant controllers (PLCs), business software (ERP), and MESManufacturing Execution System — the production management layer between ERP and the plant floor., unifies their data in one real-time view, and actively intervenes where energy costs, peak loads, or the CO₂ balance drift off course.

Control begins where data stops being separate.

Platform eco2lot one cockpit
Energy
Electricity · gas · heat
Machine
Equipment · sensors
Process
Orders · shifts
Automation
Control · intervention
Knowledge
Shift log · docs
Environment
Weather · CO₂ · climate
Who eco2lot works for

Five perspectives on one platform

Plant management, energy management, IT leadership, machine builders, executive management — every role looks at the same data from a different angle. eco2lot serves all five — on one interface.

Pain

"I only see failures in the daily report — by then the shift is long over."

Live control instead of spreadsheets

  • Real-time cockpit for load profile, shift performance, and equipment status — all on one interface.
  • Active interventions: peak loads are capped before your electricity bill feels them.
  • Shift log integration: failures, interventions, and causes are documented automatically.
Book a demo for plant management
Pain

"The energy audit costs us two weeks of spreadsheet work per year — and Germany's Energy Efficiency Act (EnEfG) now demands monthly figures."

ISO 50001 + EnEfG, fully automated

  • Complete energy data capture across electricity, gas, heat, and compressed air — with predefined counters.
  • Automated EnPI calculation (energy performance indicators), audit-proof reports at the push of a button.
  • 20 % energy savings on average — achieved purely through better operation, with your existing machines.
Request an energy quick check
Pain

"We have been building a plant data platform for 18 months — and we are still short of production."

A finished industrial data platform instead of a DIY build

  • 16 years of platform maturity — OPC UA, Modbus, MQTT, BACnet, M-Bus in productive use.
  • ISO 27001 architecture, NIS2-ready, on-premise / Own Cloud / SaaS — you choose.
  • POC in 4–8 weeks at a fixed price — instead of 18+ months of in-house development with an uncertain outcome.
Start the TCO comparison
Pain

"Our machines are excellent — but our customers now expect to see a platform too."

White-label and embedded editions

  • Co-branding and white-label — eco2lot runs under your brand, with your look.
  • Embedded edition: eco2lot modules integrated directly into your machine control (see MBS-MP ELSA).
  • Reseller program with a clear margin, joint cases, and lead routing.
See the partner model
Pain

"Every investment decision that lacks a clear ROI hangs in the pipeline for two years."

Investment protection with a clear payback

  • Fixed-price POC at €10–20k — a calculable initial investment, payback usually under 12 months.
  • 30 % productivity, 20 % energy — robust averages from ongoing projects.
  • Pilot guarantee: if the effect fails to materialize, the POC fixed price is waived.
Discuss the investment case
Integration layer

One platform, diverse hardware — and everything in one view

Your plant runs devices from many vendors — each with its own protocol, its own logic, its own terminology. eco2lot, as energy data management software, brings them into one shared model: same terms, same units, same timestamps — whether the value comes from a Janitza meter, a Wago controller, or a Kamstrup heat meter.

eco2lot SmartCalc overview: 47 configured counters in one plant — feed, quantity, and totalizing counters plus formulas in one table. The left sidebar shows the modules Favorites, Devices, Data points, SmartCalc, Sankey, Tasks, Report, Roles, Users, Suppliers, Integrations, eco2mqtt, SCADA.
Live view from my.eco2lot.de · SmartCalc module with 47 configured counters in a single plant — feed, quantities, totals, formulas, averages. The sidebar shows the full module set.
31
Device types
from different vendors
306
Data points
predefined, instantly available
142
Energy counters
across all media
500+
Interfaces
integrated over 15 years
As of my.eco2web.de · v4.4.2 — platform maturity grown over years, measured in the product rather than promised in marketing.
Vendors already running today — a selection:
Janitza Wago Kamstrup Siemens Landis+Gyr SMA ABB Beckhoff Phoenix Contact Fronius Viessmann MOXA
What eco2lot achieves elsewhere

Three plants. Three results. One platform.

Three ongoing projects, three industries — here the numbers do the talking. You will find the named case studies on the industry subpages.

Food Multi-site Lower Saxony
€70,000
refunded through optimized load management

A poultry processor, part of a group, with several sites. Peak loads in the cold store drove grid charges that only became visible in the quarterly statement — far too late. With eco2lot, the control strategy intervenes in real time.

"Finally free of the dreaded shutdowns." — Industrial foreman at the plant
Packaging Multi-site Lower Saxony
30 → 200+
meter infrastructure expanded, two plants on one platform

A cardboard-packaging manufacturer with two sites. Started with 30 energy meters, scaled to over 200 meters within 24 months — both plants on one shared eco2lot instance, with joint reporting and joint control strategies.

"Support is impeccable. We get more out of the platform than we expected at the start." — Executive management
PCB manufacturing Group subsidiary Bavaria
R² = 0.96
coefficient of determination for heating/cooling COP calculations

A PCB manufacturer owned by a world market leader in measurement and control technology. 123 water meters, HX-diagram analyses, and the Anomalyzer module in production for the automatic cleansing of phantom readings.

"It was the most sensible decision we have made in this area in the past five years." — Plant management

These three cases are just a snapshot. On the industry subpages you will find named references: Energy management · Production management

Impact in numbers

Four numbers from real plants

We measure these numbers in ongoing projects — in food manufacturing, metal processing, multi-site retail, and municipal utilities. Measured impact, straight from running plants rather than from studies or marketing promises.

20%
lower electricity bill
with the machines and contracts you already have
30%
more output
from the same plant, the same shift
4–8wks
until the first control strategy
from kick-off to the first intervention
10–20k €
pilot at a fixed price
a defined budget and a defined end date
Feature overview

All modules, connectors, and control strategies — one platform

One shared architecture for everything you measure, control, and document — replacing isolated systems that never talk to each other.

OPC UA
Modbus TCP
MQTT
BACnet
M-Bus
KNX
SNMP
REST API
Edge Gateway
Counters
Live cockpit
Sankey module
SmartCalc
Shift log
Tasks
Reports
Peak shaving
PV self-consumption
CHP control
Schedule control
AI control
Load management
ISO 50001
EnEfG reports
ISO 27001
Roles & audit
SaaS
Own Cloud
On-Premise
White-label

Note: this overview shows a cross-section. The full range of devices, data points, and interfaces has grown with every project for 15 years.

What eco2lot can do

One platform — six levers for your energy balance

eco2lot unites six operational tasks that you would otherwise spread across three to five isolated systems. Each lever can be activated on its own and scales with your equipment base.

eco2lot Sankey module: animation shows energy flows building up between counters — a loading state first, then colored bands between 17 numbered counters in the dark theme.
eco2lot Sankey module: energy flows between counters as colored bands — select plant and period, and every click interaction hides downstream flows.

Load management & peak shaving

Peak loads are forecast in 15-minute intervals and capped automatically — typically 10–20 % lower grid charges.

More on energy management

PV & CHP self-consumption

Self-generated power from PV and CHP (combined heat and power) units is distributed optimally across storage, heat pumps, and process equipment.

Maximize self-consumption

AI control & schedules

Consumption and generation are optimized against market prices, weather, and the production plan — from day-ahead to intraday.

Explore AI control

Production cockpit (OEE)

Energy per unit, OEE, and downtime Pareto in one view — connecting energy management with production control.

Go to production management

ISO 50001 workflow

EnPI calculation, audit reports, and audit trails are predefined in the platform — audit-ready in 4 weeks.

Go to energy monitoring

Multi-site consolidation

Plants, branches, and facilities are compared, benchmarked, and controlled together in one view.

Multi-site on one platform
Vendor-independent

Connect everything that delivers data

eco2lot is protocol- and vendor-open. Existing meters, equipment, control systems, and business software are integrated — and stay in place. Even legacy equipment without an IP interface connects through edge gateways.

eco2lot integrations page: connected systems such as Grafana and OPC Router are shown as individual tiles with logo, description, and a configuration button.
eco2lot integrations module: external systems as individual tiles — shown here with Grafana (your own dashboards) and OPC Router (OT data between machines and systems). Each integration comes with its own configuration flow.

Field level · OT protocols

  • OPC UA
  • Modbus TCP / RTU
  • MQTT
  • BACnet
  • M-Bus & wM-Bus
  • KNX
  • SNMP
  • Profinet / Profibus (via gateway)

Application level · IT

  • SAP (R/3, S/4HANA)
  • Microsoft Dynamics
  • Infor LN, Sage, proAlpha
  • MES — Hydra, MPDV, FASTEC, iTAC
  • Control systems — Siemens WinCC, Wonderware, AVEVA
  • REST / JSON / GraphQL
  • Webhooks & custom connectors
  • SQL and CSV imports

Hardware ecosystem

  • Meters — Janitza, Kamstrup, Landis+Gyr, Siemens, ABB
  • Controllers — Siemens S7, Wago CoDeSys, Beckhoff, Phoenix Contact
  • Edge gateways — Wago, MOXA, Revolution Pi, industrial PCs
  • Storage and PV inverters — SMA, Fronius, Sungrow
  • Heat pumps & CHP — Viessmann, Vaillant, 2G, Sokratherm

You use a protocol that is missing here? In most cases it can be connected within 1–2 days — the platform is built for extensibility.

Operating models

How you run eco2lot — three models, one platform

SaaS

We operate it for you

eco2lot in ISO 27001-certified data centers in Germany. Updates, backups, and monitoring included — the fastest route to live operation.

  • Data location: Germany
  • Update cycle: monthly
  • Suited for: SMEs, multi-site, retail chains
Own Cloud

A dedicated instance in the EU cloud

eco2lot on a dedicated cloud instance in the EU — separated from other tenants, with your own encryption.

  • Location: EU, ISO 27001-certified
  • Data sovereignty: yours
  • Suited for: critical infrastructure (KRITIS), corporate groups, regulated industries
On-Premise

On your infrastructure

The entire platform runs on your servers — air-gap capable even in closed OT networks that stay offline by design.

  • Network: fully isolatable
  • Maintenance: on site or via a VPN maintenance tunnel
  • Suited for: defense, critical infrastructure, machine OEMs
Predictable costs, licensed per plant. You scale from 30 to 200 or 2,000 meters — operations stay plannable instead of getting more expensive per point. The license follows plant and depth rather than data-point counts, replacing per-sensor subscriptions.
Build vs. buy

16 years of in-house development. So you can skip yours.

Many teams build their own today: InfluxDB plus Grafana plus a few Python scripts plus OPC UA connectors plus an energy manager wired to a favorite MES. After 18 months, a DIY build stands that is half-productive — with one key developer who must stay healthy. eco2lot is the alternative if software sits outside your plant's core business.

DIY build

A plant data platform in the DIY model

  • 18–36 months until the first productive control strategy
  • €500,000 – 2 million TCO over three years (staff · licenses · infrastructure)
  • A key developer as a staffing risk (bus factor of 1)
  • Implementing OT standards (OPC UA, MQTT Sparkplug, Modbus) correctly is specialist work
  • Compliance (ISO 27001, NIS2, KRITIS) is hard to reach in a DIY build
  • AI integration rarely makes it past the demo stage in DIY builds
eco2lot

A finished industrial data platform with in-house development behind it

  • 4–8 weeks to a POC with the first active control strategy — fixed price
  • €10,000 – 20,000 POC fixed price · license afterwards plannable per plant, independent of data points
  • 15+ years of industrial DNA in one platform — beyond what 18 months can replicate
  • 500+ interfaces, ready-made OT connectors with certificates (OPC UA, MQTT, Modbus, M-Bus, BACnet, REST)
  • Compliance-ready architecture (ISO 27001, NIS2-capable) from day one
  • MCP server roadmap for BYO-LLM — AI readiness ships as a platform feature, saving you the DIY project
What 16 years of platform stewardship look like

In-house development with architectural discipline — maintained across generations

A platform that lives for 16 years lives on a structured concept rather than on heroes. Four principles that set eco2lot apart from any DIY project:

01

Layered architecture since 2010

Connector · data model · control · UI. Four strictly separated layers. Tech stacks have been renewed several times — the concept remained.

02

Versioned releases

A version line, a changelog, a rollback path. Updates land on the platform in a controlled way — instead of Friday-evening improvisation.

03

Docs & review as a rule

Code goes live once documentation, tests, and review are in place. Knowledge is shared across the team and every role has a backup — a bus factor above 1.

04

Migration paths instead of breaks

With every technology change, existing tenants are migrated. Every data point stays with you — the platform grows and takes you along.

Investment protection: existing DIY components are integrated as data sources. Everything you built keeps its value. Book a TCO quick check
Partners & OEM integrations

Machine builders embed eco2lot into their own solutions

eco2lot is designed for co-branding and white-label. Machine builders and system integrators embed the platform into their own products — existing collaborations show what that looks like.

MBS-MP · ELSA energy-saving system

The eco2lot ELSA module is the digital layer inside the energy-saving system by MBS Maschinenbau Pforzheim. It connects the energy storage control with the operator's production planning — an OEM integration delivered turnkey.

OEM moduleEnergy storageMachine building

AES Venture · Heat-pump heating plants

AES Venture builds industrial heat-pump heating plants for facilities and factories. eco2lot delivers the digital layer: a real-time view of heat, electricity, and process data, with joint control across PV and load management.

eco2lot SCADA canvas: schematic of a heating plant with two heat pumps (HP1 70%, HP2 0%), two gas boilers (Gas 1 45%, Gas 2 1%), mixer, and sensors. Live temperatures 58°, 72°, 35°, fill levels 60%, 30%, 40%.
Example schematic: a heating plant with two heat pumps and two gas boilers, modeled in eco2lot SCADA and controlled live.
Heating plantsHeat pumpFacilities

You are a machine builder or system integrator? Start a co-branding conversation

Three steps to the cockpit view

From the first conversation to live control in 4–8 weeks

1

Metering-point check

We review your equipment base and identify your top 3 levers: peak load, self-consumption, or schedules. 60 minutes, on site or remote.

Week 1
2

Live measurement & platform setup

We connect your meters and equipment, configure the platform, and onboard your energy manager — the first KPIs appear in the cockpit.

Weeks 2–4
3

First control strategy active

The first control strategy goes live — typically peak shaving or PV self-consumption optimization. Handover to your team with training and a runbook.

Weeks 4–8
Frequently asked questions

What industrial decision-makers ask about eco2lot

What is eco2lot?

eco2lot is a vendor-independent energy management platform for manufacturing plants and facility portfolios. It connects existing meters, PLCs, ERP, and MES, unifies all energy and process data in one real-time view, and actively controls equipment — from peak shaving and self-consumption maximization to AI-supported schedule control.

How does eco2lot differ from classic monitoring software?

Monitoring tools and energy analytics software such as Janitza GridVis or Power BI visualize consumption data after the fact. eco2lot controls actively: the platform regulates equipment, generators, and storage in real time — closing the loop from measuring to optimizing to automating. Monitoring is the prerequisite, and control is the goal.

Which systems and protocols does eco2lot connect?

eco2lot is vendor- and protocol-open: OPC UA, Modbus TCP/RTU, MQTT, BACnet, M-Bus, KNX, SNMP, REST/JSON. Even older equipment without an IP interface is integrated through edge gateways. At the application level, interfaces exist for SAP, Microsoft Dynamics, Infor, common MES, and control systems.

How quickly is eco2lot ready for use?

After the initial alignment, the first live measurement typically takes 3–4 weeks, and the full proof of concept with the first active control strategy takes 4–8 weeks. The POC runs at a fixed price between 10,000 and 20,000 euros.

Where is the data hosted?

Three hosting models are available: SaaS in ISO 27001-certified data centers in Germany, Own Cloud (a dedicated instance on the EU cloud platform of your choice), or on-premise on your own infrastructure — air-gap capable even in closed OT networks.

Does eco2lot meet the requirements of ISO 50001 and the EnEfG?

Yes. eco2lot covers the normative requirements of ISO 50001:2018 and Germany's Energy Efficiency Act (EnEfG): complete energy data capture across all media, automated calculation of EnPIs (energy performance indicators), audit-proof reports, and configurable audit trails. The platform is also designed for ISO 27001 information security requirements.

Is eco2lot suitable for retail chains, facility portfolios, and multi-site operations?

Yes. eco2lot scales from a single site to a multi-site group and is used in food manufacturing, metal processing, packaging, retail chains with several hundred locations, and municipal utilities. Site comparisons, consolidation dashboards, and role separation are predefined in the platform.

Can machine builders and system integrators embed eco2lot into their own solutions?

Yes. eco2lot is designed for OEM and partner integration. Existing collaborations include the ELSA module with MBS-MP (an energy-saving system for machine control) and the digital layer for heat-pump heating plants with AES Venture. Co-branding, white-label, and reseller programs are available.

Who stands behind eco2lot
"We build industrial software because we know industrial plants — and not the other way around. Our customers need someone who speaks their language. Machines, energy, shift log, audit — before we talk about software, we understand the plant."
Andreas Babel
Founder & Managing Director, BS-Systeme · Zorneding near Munich, Germany
15+ years of industrial experience
2010 BS-Systeme founded
TOP 100 Innovator 2026

Ready for the cockpit view of your energy balance?

In 15 minutes you will know whether eco2lot fits your equipment base — and which savings potential is realistic in the first 12 months.

Value within 3 weeks — or the costs are on us. POC fixed price €10,000–20,000.

On business days, Andreas Babel or one of our experts replies personally within 4 hours. Prefer to talk right away? +49 89 413 291 000