Status time
The controller reports the state. What is missing is the duration: how many hours of production, how much setup time, how long in fault — per shift, day and month. The status time calculates it from the history.
In eco2lot, the status time determines how long a certain state was active. The basis is a data point that delivers a status — automatic mode, manual mode, production, setup mode, standstill, fault. eco2lot analyses the time profile of this data point and calculates the duration per status and evaluation period: in one shift, for example, automatic mode 5 hours, setup mode 1.5 hours, standstill 45 minutes, fault 45 minutes.
The calculation scheme
What is inside the status time
What the status time is
- The duration of a state per evaluation period
- For automatic, manual, production, setup, standstill, fault — every status
- For assignment values as well: how long did order A, batch B run
Your benefitA status signal becomes a time balance.
Which data it uses
- One status data point from controller, shop floor data collection or sensor
- The time profile with all changes
- Optionally the shift calendar for the evaluation per shift
Your benefitMost controllers already deliver the status signal.
What eco2lot calculates
- Production time, setup time, standstill time, fault time
- Usage duration and operating duration
- Per 15 minutes, hour, shift, day, week, month, year
- Comparison of shifts, machines and periods
Your benefitThe time share of every state — comparable across machines and shifts.
What benefit arises
- Setup and standstill times per shift visible
- Basis for availability and OEE
- Input for status to feed: consumption per state
- Usage duration as the basis for maintenance and investment decisions
Your benefitTime is the lever — the status time shows where it is.
Afterwards you can …
-
You know production, setup, standstill and fault time per shift, day and month.
-
Shifts and machines become comparable by their time shares.
-
The status time is the basis for availability, OEE and the assignment of consumption to states.
What you should know about the status time
What is the status time?
A calculation type that determines the duration of every state from the time profile of a status data point — per evaluation period.
Which states can the status time evaluate?
Every value a status data point delivers: automatic and manual mode, production, setup, standstill, fault — likewise assignment values such as order or batch.
Can I calculate availability or OEE from it?
The status time delivers the time shares; a formula puts them in relation, for example production time divided by planned time. Together with volume counter and scrap the OEE arises.
What is the difference between status time and status to feed?
The status time measures how long a state lasted. Status to feed measures how much energy or medium was consumed during this state. Both use the same status data point.
Can I place an alarm on the status time?
Yes. An alarm reports when the setup time per shift exceeds 90 minutes, the fault time of a machine gets too long or the production time falls below target — on the calculated duration data point per status.