eco2lot Production · Improve production and OEE

See your production the way it really runs — shift by shift.

eco2lot Production captures unit counts, machine states and downtime automatically and turns them into OEE and energy per unit. Gut feeling becomes a KPI.

Typical KPIs: OEE · Availability · Downtime · Cycle times · kWh per unit

What is eco2lot Production?

eco2lot Production is the production area of the eco2lot platform and its production monitoring software. It captures unit counts, good parts and scrap, machine states, operating hours and downtime, calculates overall equipment effectiveness (OEE) from them and links production data with energy data — down to the KPI energy per unit, tonne or order.

The starting point

What slows down daily operations today

OEE is an estimate

Availability, performance and quality are reported on request or calculated weekly in Excel. The number that decisions depend on is itself a guess.

Downtime stays unexplained

Everyone knows a line stood still. Why it stood still is at best written in the paper shift log — and cannot be found in the next improvement round.

Energy and production are separate worlds

Energy consumption runs in one system, unit counts in another. Whether a shift produced efficiently can only be guessed that way.

Your benefit

What eco2lot Production changes for you

OEE live instead of in hindsight

Availability, performance and quality are derived automatically from machine data — per line, shift and order. Improvements become visible the same day.

Downtime with cause and pattern

Downtime reasons are captured and evaluated: which cause, which clustering, which shift. Your improvement work starts where it pays off most.

Energy per unit as a control variable

Production and energy data share one data basis. Efficiency becomes comparable: per unit, per tonne, per order — and across changeovers and downtime.

Features

What is inside eco2lot Production

Capture

  • Unit counts, good parts and scrap (smartcalc quantity counter)
  • Machine states and operating hours
  • Downtime with fault reason capture
  • Shift and order logic (e.g. 06:00–05:59)

Evaluate

  • OEE: availability × performance × quality
  • Cycle time and changeover time analysis
  • Shift reports distributed automatically
  • Energy per unit, tonne, order and batch

Improve

  • Digital shift log and handovers
  • Maintenance management (interval- or condition-based)
  • Checklists for recurring inspections
  • Task and action tracking (continuous improvement)

All platform features in detail →

Isometric illustration: conveyor belt with boxes, orange robot arm and a floating dashboard with gauge and bar chart
Data sources & integrations

Connects to what is already there

eco2lot Production talks to your machines and systems: directly via the controller (PLC), via OPC UA or MQTT — and to existing MES and production data acquisition systems via interfaces.

OPC UAPLC connection (Siemens, Beckhoff, Wago and others)MESProduction data acquisition systemsModbus TCPMQTTCSV / Excel import
From practice

An example with numbers

Worked exampleEnergy × production
0.148 kWh / unit
from 12,400 kWh and 84,000 produced parts

Classic energy monitoring reports 12,400 kWh — a number with no reference. eco2lot Production places the 84,000 produced parts next to it and turns it into a controllable KPI: 0.148 kWh per unit, comparable across shifts, products and sites.

Frequently asked questions

What you should know about eco2lot Production

What is eco2lot Production?

eco2lot Production is the production area of the eco2lot platform. It captures unit counts, machine states, operating hours and downtime, calculates overall equipment effectiveness (OEE) and links production data with energy data down to the KPI energy per unit. It runs on the shared data foundation of the platform.

Do I need an MES for this?

An MES is helpful, but not a prerequisite. eco2lot Production captures machine data directly via OPC UA, MQTT or the PLC and complements existing MES and production data acquisition systems via interfaces. Many customers start with a single line and without any MES.

How is OEE calculated?

Using the standard formula OEE = availability × performance × quality. The three factors are derived automatically from machine states, cycle times and good/bad quantities. The derivation with a worked example is on the German glossary page for the OEE formula.

Which machines can be connected?

New and old alike: modern machines deliver data via OPC UA or MQTT, existing equipment is connected via the PLC, digital signals or retrofit sensors. There is no vendor lock-in — the connection runs over open protocols.

How is the KPI energy per unit created?

Energy and production data sit on the same data basis in eco2lot with the same time axis. The platform divides the consumption of a period by the produced quantity — per line, order or batch. That is how 12,400 kWh and 84,000 parts become the KPI 0.148 kWh per unit.

How do I get started with eco2lot Production?

Via the configurator: state your starting point and goals, receive a recommendation and a price indication. A proven entry is one line with unit count and state capture — the OEE basis is in place within a few weeks.

Which eco2lot solution fits your operation?

Put your solution together from the areas you need today — you can expand at any time. We get back to you with a concrete recommendation and a price indication.

Configure Production