Faults are noticed too late
The plant has been down for hours, the limit was breached yesterday — and nobody noticed. The damage grows with every minute between event and reaction.
eco2lot Control combines live monitoring, alarm management and active intervention: set setpoints, manage loads, keep schedules. Every step within safety limits, authorized and logged.
eco2lot Control is the control area of the eco2lot platform and its plant monitoring and control software. It monitors technical plants live, reports faults and limit violations through alarm chains and intervenes actively: setpoints, switching commands, schedules and load management — within safety limits, authorized by role and with a complete audit trail, a log of every intervention.
The plant has been down for hours, the limit was breached yesterday — and nobody noticed. The damage grows with every minute between event and reaction.
Adjust a setpoint, acknowledge a plant, change a schedule: for two minutes of work someone drives two hours — or it simply does not happen.
When several large consumers happen to start at the same time, the peak that sets a whole year of grid charges is born. By hand, that moment is impossible to catch.
Alarms with escalation chains reach the right person on the right channel — with cause and context. Acknowledgement and root-cause documentation happen in the same interface.
Write access is disabled by default. Every controllable data point needs an explicit release with value range and role. Every command is logged and read back for confirmation.
Peak shaving, self-consumption optimization and schedule monitoring run automatically — even at three in the morning, when nobody is looking at the dashboard.
Plant mimics, alarms and setpoints in one interface — SCADA functions directly on the data foundation.
View use caseControl heat pumps, wallboxes and storage in a coordinated way — within the available grid connection capacity (in Germany governed by §14a EnWG).
Discuss this applicationLearning models detect load peaks 10–30 minutes ahead and control within defined safety windows.
Discuss this application
The path to the plant runs over open protocols and the edge operating system eco2node: it keeps the connection, buffers data locally and executes released commands directly at the device — your plants stay unreachable from the internet.
A poultry processor struggled with peak loads in the cold store that only became visible on the quarterly invoice. With eco2lot Control the control strategy intervenes in real time — the avoided peaks brought a grid charge refund of 70,000 euros.
“Finally without the dreaded outages.” — Industrial foreman at the plant
All eco2lot areas work on the same data foundation. You start with one area and add further ones as soon as you need them — on the infrastructure you already have.
The analytics behind the control: load profiles, KPIs and proof of success for every strategy — on the same data foundation.
Discover eco2lot Energy → Control + ProductionControl with production context: load management that knows orders and shifts instead of switching off blindly.
Discover eco2lot Production → Control + BuildingsRun building technology across all sites: schedules, setpoints and fault messages centrally for the whole portfolio.
Discover eco2lot Buildings →eco2lot Control is the control area of the eco2lot platform. It monitors plants live, raises alarms on faults and intervenes actively — from setpoints and schedules to automatic load management. Every intervention is within safety limits, authorized by role and logged in the audit trail.
Write access is disabled by default. Every controllable data point needs an explicit release with a permitted value range, every command is authorized by role, logged and confirmed by reading back from the device. The connection is always established from the plant side to the platform — your plants stay unreachable from the internet.
eco2lot Control works together with existing control systems and controllers and adds the cross-site, web-based view including alerting and control strategies. A classic SCADA system (control room software for plant supervision) stays where it is needed — the platform takes over the level above it.
Typical applications are CHP units, heat pumps, refrigeration systems, ventilation, energy-saving systems, EV charging parks and machines with released interfaces. Connection runs via PLC, OPC UA, Modbus, MQTT or OCPP — independent of the manufacturer.
The local level keeps working autonomously: eco2node executes the last valid configuration, stores all readings locally and transfers them automatically after reconnection. Safety-relevant interlocks always remain in the plant controller on site.
Via the configurator: state your plants and goals, receive a recommendation and a price indication. The proven entry is monitoring and alerting — active control follows as soon as the data basis and the releases are in place.
Put your solution together from the areas you need today — you can expand at any time. We get back to you with a concrete recommendation and a price indication.
Configure Control